Customization: | Available |
---|---|
After-sales Service: | 24 Hours Service |
Warranty: | 6 Months |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name
|
carbon steel pipe
|
|||
Surface
|
Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE
|
|||
Thickness
|
1-300mm or as request
|
|||
Grade
|
1.7220,1.7336,1.2601,1.7380,1.7335,1.0033,1.0116 etc.
|
|||
Application
|
Widely used in construction, chemical, food, agriculture, ship parts and other industries. Suitable for train, airplane, conveyer belt, vehicle, bolt, nut, spring, screen, etc. |
|||
Payment Terms
|
30% TT deposit and 70% LC the balance
|
|||
Shipping Time
|
2000ton:Within 7days after deposit Customize Size:Within 10days after deposit OEM Product: Within 15 days after deposit
|
|
|
|
Packing
|
Steel factory original packaging + export wooden pallet,If you have other packaging requirements, please contact us
|
|
|
|
Shape
|
square tube and round tube
|
|
|
|
Technique
|
Hot Dip Galvanized Round Steel Pipe/Square tube
|
|
|
|
Packing
|
Bundle, or with all kinds of colors PVC or as your requirements
|
|
|
|
length
|
Length:Single random length/Double random length,5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques
|
|
|
|
Materials
|
10#,20#,45#,Q235,Q345,Q195,Q215,Q345C,Q345A
|
|
|
|
ASTM A53A/A53B/ A178C/A106B API5L
|
|
|
|
|
ST37,ST37-2,DIN 1629 ST35, ST45,DIN 17175 ST35.8,DIN 17175 19Mn5
|
|
|
|
|
16Mn,Q345B,T1,T2,T5,T9,T11,T12,T22,T91,T92,P1,P2,P5,P9,P11,P12,P22,P91,P92,15CrMO,Cr5Mo,10CrMo910,12CrMo,13CrMo44,30CrMo,A333 GR.1,GR.3,GR.6,GR.7 |
|
|
|
|
Gr.B,X42,X46,X52,X60,X65,X70,X80,X100
|
|
|
|
Introduction
ERW Steel Pipe(Electric Resistance Welded Pipe), A53 ERW Pipe, ERW Carbon Steel Pipe
Product Details of ERW steel pipe
Pipe End: square ends (straight cut, saw cut, and torch cut). or beveled for welding, beveled,
Surface: Lightly oiled, Hot dip galvanized, Electro galvanized, Black, Bare, Varnish coating/Anti rust oil, Protective Coatings (Coal Tar Epoxy, Fusion Bond Epoxy, 3-layers PE)
Packing: Plastic plugs in both ends, Hexagonal bundles of max. 2,000kg with several steel strips, Two tags on each bundle, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips, Plastic caps.
Test: Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield strength, Elongation), Technical Properties (Flattening Test, Bending Test, Hardness Test, Impact Test), Exterior Size Inspection, Hydrostatic Test, NDT TEST ( ET TEST, RT TEST, UT TEST)
For ERW Line Pipe For ERW Casing
For ERW Structure Tube
For High pressure and high temperature
Size
Out Diameter:21.3-660mm
Wall Thickness: 1.0-20mm
Length : 3-12m, or according to customer's requirement
End : Plain End, Beveled End, Treaded
Standard
ASTM 5L, ASTM A53, ASTM A178, ASTM A500/501, ASTM A691, ASTM A252, ASTM A672, EN 10217
Steel Grade:
API 5L: PSL1/PSL2 Gr.A, Gr.B, X42, X46, X52, X56, X60, X65, X70
ASTM A53: GR.A, GR.B,ASTM A500 JIS G3466
EN: S275, S275JR, S355JRH, S355J2H,EN10219-1 ,EN10217-1
GB: Q195, Q215, Q235, Q345, L175, L210, L245, L320, L360-L555
Specification
Out diameter |
Sch 5 |
Sch 10 |
Sch 40 |
||||
Inch |
mm |
Thickness |
Kg/mtr |
Thickness |
Kg/mtr |
Thickness |
Kg/mtr |
1/2" |
21.3 |
1.65 |
0.81 |
2.11 |
1.01 |
2.77 |
1.29 |
3/4" |
26.7 |
1.65 |
1.03 |
2.11 |
1.30 |
2.87 |
1.71 |
1" |
33.4 |
1.65 |
1.31 |
2.77 |
2.12 |
3.38 |
2.54 |
1 1/4" |
42.2 |
1.65 |
1.93 |
2.77 |
3.15 |
3.68 |
4.11 |
1 1/2" |
48.3 |
1.65 |
1.93 |
2.77 |
3.15 |
3.68 |
4.11 |
2" |
60.3 |
1.65 |
2.42 |
2.77 |
3.98 |
4.81 |
5.31 |
3" |
88.9 |
2.11 |
4.58 |
3.05 |
6.54 |
5.49 |
11.45 |
3 1/2" |
101.6 |
2.11 |
5.25 |
3.05 |
7.52 |
5.74 |
13.77 |
4" |
114.3 |
2.11 |
5.25 |
3.05 |
7.52 |
5.74 |
13.77 |
5" |
141.3 |
2.77 |
9.50 |
3.40 |
11.74 |
6.55 |
22.10 |
6" |
168.3 |
2.77 |
11.47 |
3.40 |
14.04 |
7.11 |
28.68 |
8" |
219.1 |
2.77 |
14.99 |
3.76 |
20.25 |
8.18 |
43.16 |
Chemical Analysis and Mechanical Properties
Chemical Analysis and Mechanical Properties |
||||||||
Standard |
Class |
Grade |
Chemical Analysis(%) |
Mechanical Properties(min)(Mpa) |
||||
C |
Mn |
P |
S |
Tensile Strength |
Yield Strength |
|||
API 5L |
PSL1 |
B |
0.26 |
1.2 |
0.03 |
0.03 |
414 |
241 |
X42 |
0.26 |
1.3 |
0.03 |
0.03 |
414 |
290 |
||
X46 |
0.26 |
1.4 |
0.03 |
0.03 |
434 |
317 |
||
X52 |
0.26 |
1.4 |
0.03 |
0.03 |
455 |
359 |
||
X56 |
0.26 |
1.4 |
0.03 |
0.03 |
490 |
386 |
||
X60 |
0.26 |
1.4 |
0.03 |
0.03 |
517 |
414 |
||
X65 |
0.26 |
1.45 |
0.03 |
0.03 |
531 |
448 |
||
X70 |
0.26 |
1.65 |
0.03 |
0.03 |
565 |
483 |
||
PSL2 |
B |
0.22 |
1.2 |
0.025 |
0.015 |
414 |
241 |
|
X42 |
0.22 |
1.3 |
0.025 |
0.015 |
414 |
290 |
||
X46 |
0.22 |
1.4 |
0.025 |
0.015 |
434 |
317 |
||
X52 |
0.22 |
1.4 |
0.025 |
0.015 |
455 |
359 |
||
X56 |
0.22 |
1.4 |
0.025 |
0.015 |
490 |
386 |
||
X60 |
0.22 |
1.4 |
0.025 |
0.015 |
517 |
414 |
||
X65 |
0.22 |
1.45 |
0.025 |
0.015 |
531 |
448 |
||
X70 |
0.22 |
1.65 |
0.025 |
0.015 |
565 |
483 |
||
X80 |
0.22 |
1.85 |
0.025 |
0.015 |
621 |
552 |
· 1- Plastic caps plugged at the two sides of pipe ends
· 2- Should be avoided by the steel strapping and transport damage
· 3- Bundled signs should be uniform and consistent
· 4- The same bundle(batch) of steel pipe should be came from the same furnace.
· 5- The steel pipe has the same furnace number, the same steel grade, the same specifications.
1.Q: Can we visit your factory?
-A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
2.Q: Can provide OEM/ODM service?
-A: Yes. Please feel free to contact us for more details discuss.
3.Q: How is your Payment Term?
-A:We prefer TT
4.Q: Can you provide sample?
-A: Yes, for regular size of samples, it's for free but buyer need to pay freight cost.
5.Q.Surface coating
A:Antirusted painting, varnish painting, galvanized, 3LPE, 3PP,Zinc oxide yellow primer,Zinc phosphate primer and as per customers' request.
6.Q:Why choose our company ?
-A:(1)We are specialized in this industry for more than 20 years
(2) We are the gold supplier on Alibaba com
7.Q: What's the MOQ ?
-A: 5Tons is ok
8.Q: What's your delivery time ?
-A:Regular lead time is 15 to 30 days after receiving deposit